Vung Ang II BOT Thermal Power Plant
- Construction of 500kV transmission line
- Construction of 500kV substation and equipment installation
- Construction for expansion of switchyard with 2 500kV bays
- Design consultancy, installation, testing, calibration, energizing and COD
![Investor](https://vtechco.com/wp-content/uploads/2023/05/Group-18832.png)
Investor:
Doosan Heavy Industries Vietnam Co., Ltd
![Location](https://vtechco.com/wp-content/uploads/2023/05/Layer_1-3.png)
Location:
Ha Tinh
![Implementation Period](https://vtechco.com/wp-content/uploads/2023/05/Layer_1-4.png)
Implementation Period:
04/2022-09/2023
![Status](https://vtechco.com/wp-content/uploads/2023/05/Group-18844.png)
Status:
Processing
Project Detail
Construction of 500kV transmissionline