Vung Ang II BOT Thermal Power Plant

  •  Construction of 500kV transmission line
  • Construction of 500kV substation and equipment installation
  • Construction for expansion of switchyard with 2 500kV bays
  • Design consultancy, installation, testing, calibration, energizing and COD
Investor

Investor:

Doosan Heavy Industries Vietnam Co., Ltd
Location

Location:

Ha Tinh
Implementation Period

Implementation Period:

04/2022-09/2023
Status

Status:

Processing

Project Detail

Construction of 500kV transmissionline