Quang Binh BT Wind Power Farm Cluster
- 220kV/33kV primary equipment
- Measuring and protecting control cabinet
- Telecommunications & SCADA system
- Building substations and 220kV lines
- Consulting design, installation, testing commissioning and energizing to
put the project into commercial operation.
![Investor](https://vtechco.com/wp-content/uploads/2023/04/Group-18832.png)
Investor:
BT1 Windfarm Joint stock Company, BT2 Windfarm Joint stock Company, BT3 Windfarm Joint stock Company
![Implementation Period](https://vtechco.com/wp-content/uploads/2023/04/Layer_1.png)
Implementation Period:
07/2020 - 09/2021
![Locaiton](https://vtechco.com/wp-content/uploads/2023/04/Layer_2.png)
Locaiton:
Quang Binh
![Status](https://vtechco.com/wp-content/uploads/2023/04/Group-18844.png)
Status:
Completed
Project Detail
- Construction of 220kV substatio