AMI Khanh Hoa Solar Power Plant
- 110kV transformer
- 110kV / 22kV primary equipment
- Measuring and protecting control cabinet
- Telecommunications & SCADA system
- Building stations and 110kV lines
- Consulting design, installation, testing commissioning and energizing
to put the project into commercial operatio
![Investor](https://vtechco.com/wp-content/uploads/2023/05/Group-18832.png)
Investor:
AMI Khanh Hoa Solar Power Plant
![Location](https://vtechco.com/wp-content/uploads/2023/05/Layer_1-3.png)
Location:
Khanh Hoa
![Implementation Period](https://vtechco.com/wp-content/uploads/2023/05/Layer_1-4.png)
Implementation Period:
08/2018 – 05/2019
![Status](https://vtechco.com/wp-content/uploads/2023/05/Group-18844.png)
Status:
Completed
Project Detail
Building stations and 110kV lines