AMI Khanh Hoa Solar Power Plant

  • 110kV transformer
  • 110kV / 22kV primary equipment
  • Measuring and protecting control cabinet
  • Telecommunications & SCADA system
  • Building stations and 110kV lines
  • Consulting design, installation, testing commissioning and energizing
    to put the project into commercial operatio
Investor

Investor:

AMI Khanh Hoa Solar Power Plant
Location

Location:

Khanh Hoa
Implementation Period

Implementation Period:

08/2018 – 05/2019
Status

Status:

Completed

Project Detail

Building stations and 110kV lines