Vung Ang II BOT Thermal Power Plant
- Construction of 500kV transmission line
- Construction of 500kV substation and equipment installation
- Construction for expansion of switchyard with 2 500kV bays
- Design consultancy, installation, testing, calibration, energizing and COD
Investor:
Doosan Heavy Industries Vietnam Co., Ltd
Location:
Ha Tinh
Implementation Period:
04/2022-09/2023
Status:
Completed
Project Detail
Construction of 500kV transmissionline