Establishment of a centralized information intersection at 11 Cua Bac Building

  • SHD Optical transmission device
  • PCM-30 device
  • Monitoring software system
  • 48VDC power supply system, battery
  • IT system: Server, optical switch
  • Installation, configuration, testing and commissioning of all equipment and 48VDC power system, battery
  • Installing, configuring IT system for monitoring system
Investor

Investor:

Vietnam Electricity
Location

Location:

Ha Noi
Implementation Period

Implementation Period:

10/2014 – 01/2015
Status

Status:

Completed

Project Detail

Installation, configuration, testing and commissioning of all equipment and 48VDC power system, battery