Cam Hung Solar Power Plant

  • 110kV transformer.
  • The first device 110kV/22kV.
  • Protection and measurement control cabinets telecommunications and SCADA systems.
  • Construction of station house and 110kV transmission line.
Investor

Investor:

GA Power solar park Cam Xuyen Ltd
Implementation Period

Implementation Period:

5/2020 – 12/2020
Location

Location:

Ha Tinh
Status

Status:

Completed

Project Detail

Design consultancy, installation, testing, calibration, energizing to put the project into commercial operation