Build monitoring system of transmission equipment of Power transmission companies
- Installation, configuration and commissioning of the system and connection of monitoring for transmission equipment and WAN
- Training transmission equipment monitoring
system and WAN monitoring system

Investor:
Power transmission company 3

Implementation Period:
09/2017 – 12/2017

Location:

Status:
Completed
Project Detail
Installation, configuration and commissioning of the system and connection of monitoring for transmission equipment and WAN