Nam San 3A, Nam San 3B Hydropower Plants
- 110kV/22kV primary and secondary equipment
- Protection & control panels for measurement
- Telecommunications and SCADA systems
- Design consultancy, installation, testing, calibration, energizing and COD
Investor:
Nam San 3A Power Sole Company Limited
Implementation Period:
07/2022 - 06/2023
Location:
LAOS
Status:
Processing
Project Detail
Design consultancy, installation, testing, calibration, energizing and COD