Build monitoring system of transmission equipment of Power transmission companies

  • Installation, configuration and commissioning of the system and connection of monitoring for transmission equipment and WAN
  • Training transmission equipment monitoring
    system and WAN monitoring system
Investor

Investor:

Power transmission company 3
Implementation Period

Implementation Period:

09/2017 – 12/2017
Location

Location:

Status

Status:

Completed

Project Detail

Installation, configuration and commissioning of the system and connection of monitoring for transmission equipment and WAN