Establishment of a centralized information intersection at 11 Cua Bac Building
- SHD Optical transmission device
- PCM-30 device
- Monitoring software system
- 48VDC power supply system, battery
- IT system: Server, optical switch
- Installation, configuration, testing and commissioning of all equipment and 48VDC power system, battery
- Installing, configuring IT system for monitoring system
Investor:
Vietnam Electricity
Location:
Ha Noi
Implementation Period:
10/2014 – 01/2015
Status:
Completed
Project Detail
Installation, configuration, testing and commissioning of all equipment and 48VDC power system, battery