{"id":2842,"date":"2025-12-27T02:38:36","date_gmt":"2025-12-27T02:38:36","guid":{"rendered":"https:\/\/vtechco.com\/vtech-dong-dien-thanh-cong-du-an-tram-bien-ap-110kv-phuc-tho-2\/"},"modified":"2025-12-29T07:00:29","modified_gmt":"2025-12-29T07:00:29","slug":"vtech-successfully-energizes-the-110kv-phuc-tho-2-substation-project","status":"publish","type":"post","link":"https:\/\/vtechco.com\/en\/vtech-successfully-energizes-the-110kv-phuc-tho-2-substation-project\/","title":{"rendered":"VTECH Successfully Energizes the 110kV Phuc Tho 2 Substation Project"},"content":{"rendered":"<p>On December 27, 2025, Vietnam Technology Co., Ltd. (VTECH), in coordination with Hanoi Power Corporation (EVNHANOI) and relevant agencies, successfully energized and commissioned the 110kV Phuc Tho 2 Substation, marking the completion of another vital electrical project in Western Hanoi.<\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\" wp-image-2787 aligncenter\" src=\"https:\/\/vtechco.com\/wp-content\/uploads\/2025\/12\/7-300x216.png\" alt=\"\" width=\"609\" height=\"439\" srcset=\"https:\/\/vtechco.com\/wp-content\/uploads\/2025\/12\/7-300x216.png 300w, https:\/\/vtechco.com\/wp-content\/uploads\/2025\/12\/7-1024x737.png 1024w, https:\/\/vtechco.com\/wp-content\/uploads\/2025\/12\/7-768x553.png 768w, https:\/\/vtechco.com\/wp-content\/uploads\/2025\/12\/7-1536x1106.png 1536w, https:\/\/vtechco.com\/wp-content\/uploads\/2025\/12\/7-2048x1475.png 2048w\" sizes=\"(max-width: 609px) 100vw, 609px\" \/><\/p>\n<p>The project was implemented to meet the increasing load demand in the western region of Hanoi, helping to reduce the load on the existing 110kV Phuc Tho Substation while enhancing the reliability, safety, and operational flexibility of the regional power grid.<\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\" wp-image-2781 aligncenter\" src=\"https:\/\/vtechco.com\/wp-content\/uploads\/2025\/12\/4-300x216.png\" alt=\"\" width=\"604\" height=\"435\" srcset=\"https:\/\/vtechco.com\/wp-content\/uploads\/2025\/12\/4-300x216.png 300w, https:\/\/vtechco.com\/wp-content\/uploads\/2025\/12\/4-1024x737.png 1024w, https:\/\/vtechco.com\/wp-content\/uploads\/2025\/12\/4-768x553.png 768w, https:\/\/vtechco.com\/wp-content\/uploads\/2025\/12\/4-1536x1106.png 1536w, https:\/\/vtechco.com\/wp-content\/uploads\/2025\/12\/4-2048x1475.png 2048w\" sizes=\"(max-width: 604px) 100vw, 604px\" \/><\/p>\n<p>The commissioning of the 110kV Phuc Tho 2 Substation plays a significant role in ensuring a stable power supply for urban development and digital infrastructure. It also serves the green energy transition roadmap, developing the power system toward a modern and sustainable future.<\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\" wp-image-2785 aligncenter\" src=\"https:\/\/vtechco.com\/wp-content\/uploads\/2025\/12\/6-300x216.png\" alt=\"\" width=\"607\" height=\"437\" srcset=\"https:\/\/vtechco.com\/wp-content\/uploads\/2025\/12\/6-300x216.png 300w, https:\/\/vtechco.com\/wp-content\/uploads\/2025\/12\/6-1024x737.png 1024w, https:\/\/vtechco.com\/wp-content\/uploads\/2025\/12\/6-768x553.png 768w, https:\/\/vtechco.com\/wp-content\/uploads\/2025\/12\/6-1536x1106.png 1536w, https:\/\/vtechco.com\/wp-content\/uploads\/2025\/12\/6-2048x1475.png 2048w\" sizes=\"(max-width: 607px) 100vw, 607px\" \/><\/p>\n<p>&nbsp;<\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\" wp-image-2783 aligncenter\" src=\"https:\/\/vtechco.com\/wp-content\/uploads\/2025\/12\/5-300x216.png\" alt=\"\" width=\"606\" height=\"436\" srcset=\"https:\/\/vtechco.com\/wp-content\/uploads\/2025\/12\/5-300x216.png 300w, https:\/\/vtechco.com\/wp-content\/uploads\/2025\/12\/5-1024x737.png 1024w, https:\/\/vtechco.com\/wp-content\/uploads\/2025\/12\/5-768x553.png 768w, https:\/\/vtechco.com\/wp-content\/uploads\/2025\/12\/5-1536x1106.png 1536w, https:\/\/vtechco.com\/wp-content\/uploads\/2025\/12\/5-2048x1475.png 2048w\" sizes=\"(max-width: 606px) 100vw, 606px\" \/><\/p>\n<p>Throughout the construction process, VTECH\u2019s team of engineers and workers worked with a high sense of responsibility, strictly adhering to technical and safety standards to ensure the project was completed on schedule, meeting all quality and technical requirements.<\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\" wp-image-2789 aligncenter\" src=\"https:\/\/vtechco.com\/wp-content\/uploads\/2025\/12\/3-300x216.png\" alt=\"\" width=\"599\" height=\"431\" srcset=\"https:\/\/vtechco.com\/wp-content\/uploads\/2025\/12\/3-300x216.png 300w, https:\/\/vtechco.com\/wp-content\/uploads\/2025\/12\/3-1024x737.png 1024w, https:\/\/vtechco.com\/wp-content\/uploads\/2025\/12\/3-768x553.png 768w, https:\/\/vtechco.com\/wp-content\/uploads\/2025\/12\/3-1536x1106.png 1536w, https:\/\/vtechco.com\/wp-content\/uploads\/2025\/12\/3-2048x1475.png 2048w\" sizes=\"(max-width: 599px) 100vw, 599px\" \/><\/p>\n<p>The successful energization of the 110kV Phuc Tho 2 Substation further reaffirms VTECH\u2019s capability and reputation in the construction and installation of electrical projects. This achievement contributes to socio-economic development and creates a strong momentum for the sustainable growth of Hanoi in the coming period.<\/p>\n<p>&gt;&gt; Project details: https:\/\/vtechco.com\/project\/du-an-xay-moi-tram-bien-ap-110kv-phuc-tho-2-va-re-nhanh\/<\/p>\n","protected":false},"excerpt":{"rendered":"<p>On December 27, 2025, Vietnam Technology Co., Ltd. (VTECH), in coordination with Hanoi Power Corporation (EVNHANOI) and relevant agencies, successfully energized and commissioned the 110kV Phuc Tho 2 Substation, marking the completion of another vital electrical project in Western Hanoi. The project was implemented to meet the increasing load demand in the western region of [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":2784,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[33,15,34,35],"tags":[],"acf":[],"_links":{"self":[{"href":"https:\/\/vtechco.com\/en\/wp-json\/wp\/v2\/posts\/2842"}],"collection":[{"href":"https:\/\/vtechco.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/vtechco.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/vtechco.com\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/vtechco.com\/en\/wp-json\/wp\/v2\/comments?post=2842"}],"version-history":[{"count":3,"href":"https:\/\/vtechco.com\/en\/wp-json\/wp\/v2\/posts\/2842\/revisions"}],"predecessor-version":[{"id":2845,"href":"https:\/\/vtechco.com\/en\/wp-json\/wp\/v2\/posts\/2842\/revisions\/2845"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/vtechco.com\/en\/wp-json\/wp\/v2\/media\/2784"}],"wp:attachment":[{"href":"https:\/\/vtechco.com\/en\/wp-json\/wp\/v2\/media?parent=2842"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/vtechco.com\/en\/wp-json\/wp\/v2\/categories?post=2842"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/vtechco.com\/en\/wp-json\/wp\/v2\/tags?post=2842"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}