{"id":2816,"date":"2025-08-30T02:51:28","date_gmt":"2025-08-30T02:51:28","guid":{"rendered":"https:\/\/vtechco.com\/nghiem-thu-dong-dien-duong-day-110kv-t220-van-ninh-van-gia-va-t220-van-ninh-deo-ca\/"},"modified":"2025-12-29T04:53:25","modified_gmt":"2025-12-29T04:53:25","slug":"acceptance-and-energization-of-the-110kv-t220-van-ninh-van-gia-and-t220-van-ninh-deo-ca-transmission-lines","status":"publish","type":"post","link":"https:\/\/vtechco.com\/en\/acceptance-and-energization-of-the-110kv-t220-van-ninh-van-gia-and-t220-van-ninh-deo-ca-transmission-lines\/","title":{"rendered":"Acceptance and Energization of the 110kV T220 Van Ninh &#8211; Van Gia and T220 Van Ninh &#8211; Deo Ca Transmission Lines"},"content":{"rendered":"<p>August 30, 2025 &#8211; Vietnam Technology Co., Ltd. (VTECH) successfully organized the final acceptance ceremony for the 110kV T220 Van Ninh &#8211; Van Gia and T220 Van Ninh &#8211; Deo Ca transmission line projects.<\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\" wp-image-2606 aligncenter\" src=\"https:\/\/vtechco.com\/wp-content\/uploads\/2025\/09\/z7006626539559_24306e5ceeacfc02804af100f08b62a6-300x225.jpg\" alt=\"\" width=\"707\" height=\"530\" srcset=\"https:\/\/vtechco.com\/wp-content\/uploads\/2025\/09\/z7006626539559_24306e5ceeacfc02804af100f08b62a6-300x225.jpg 300w, https:\/\/vtechco.com\/wp-content\/uploads\/2025\/09\/z7006626539559_24306e5ceeacfc02804af100f08b62a6-1024x768.jpg 1024w, https:\/\/vtechco.com\/wp-content\/uploads\/2025\/09\/z7006626539559_24306e5ceeacfc02804af100f08b62a6-768x576.jpg 768w, https:\/\/vtechco.com\/wp-content\/uploads\/2025\/09\/z7006626539559_24306e5ceeacfc02804af100f08b62a6.jpg 1280w\" sizes=\"(max-width: 707px) 100vw, 707px\" \/><\/p>\n<p>The ceremony took place at the 220kV Van Ninh Substation area, with the participation of representatives from Khanh Hoa Power Joint Stock Company and various supervision consulting units. This represents a significant milestone, marking the project&#8217;s completion and ensuring the stable and efficient operation of the regional power transmission system.<\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\" wp-image-2612 aligncenter\" src=\"https:\/\/vtechco.com\/wp-content\/uploads\/2025\/09\/z7006626558012_87d75e8221099473c254a1c3aba1faaa-300x225.jpg\" alt=\"\" width=\"700\" height=\"525\" srcset=\"https:\/\/vtechco.com\/wp-content\/uploads\/2025\/09\/z7006626558012_87d75e8221099473c254a1c3aba1faaa-300x225.jpg 300w, https:\/\/vtechco.com\/wp-content\/uploads\/2025\/09\/z7006626558012_87d75e8221099473c254a1c3aba1faaa-1024x768.jpg 1024w, https:\/\/vtechco.com\/wp-content\/uploads\/2025\/09\/z7006626558012_87d75e8221099473c254a1c3aba1faaa-768x576.jpg 768w, https:\/\/vtechco.com\/wp-content\/uploads\/2025\/09\/z7006626558012_87d75e8221099473c254a1c3aba1faaa.jpg 1280w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/><\/p>\n<p data-path-to-node=\"5\">VTECH\u2019s scope of work included several critical items:<\/p>\n<ul data-path-to-node=\"6\">\n<li>\n<p data-path-to-node=\"6,0,0\">Execution of connection construction at positions <b data-path-to-node=\"6,0,0\" data-index-in-node=\"50\">2A<\/b> and <b data-path-to-node=\"6,0,0\" data-index-in-node=\"57\">VT2B<\/b>, forming two distinct 110kV lines.<\/p>\n<\/li>\n<li>\n<p data-path-to-node=\"6,1,0\">Replacement of fiber optic cables from position <b data-path-to-node=\"6,1,0\" data-index-in-node=\"48\">2B<\/b> to <b data-path-to-node=\"6,1,0\" data-index-in-node=\"54\">VT 400<\/b>.<\/p>\n<\/li>\n<li>\n<p data-path-to-node=\"6,2,0\">Management of the 110kV line energization process.<\/p>\n<\/li>\n<\/ul>\n<p>All stages were executed in strict accordance with the established schedule and rigorous technical standards.<\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\" wp-image-2608 aligncenter\" src=\"https:\/\/vtechco.com\/wp-content\/uploads\/2025\/09\/z7006626538361_bdaf8ef4379ddebcf71767bb7ace14f5-300x225.jpg\" alt=\"\" width=\"704\" height=\"528\" srcset=\"https:\/\/vtechco.com\/wp-content\/uploads\/2025\/09\/z7006626538361_bdaf8ef4379ddebcf71767bb7ace14f5-300x225.jpg 300w, https:\/\/vtechco.com\/wp-content\/uploads\/2025\/09\/z7006626538361_bdaf8ef4379ddebcf71767bb7ace14f5-1024x768.jpg 1024w, https:\/\/vtechco.com\/wp-content\/uploads\/2025\/09\/z7006626538361_bdaf8ef4379ddebcf71767bb7ace14f5-768x576.jpg 768w, https:\/\/vtechco.com\/wp-content\/uploads\/2025\/09\/z7006626538361_bdaf8ef4379ddebcf71767bb7ace14f5.jpg 1280w\" sizes=\"(max-width: 704px) 100vw, 704px\" \/><\/p>\n<p>The completion of this project not only enhances power supply capacity but also contributes significantly to the development of the national grid infrastructure. VTECH remains committed to working closely with its partners to deliver advanced and sustainable technological solutions for the energy sector.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>August 30, 2025 &#8211; Vietnam Technology Co., Ltd. (VTECH) successfully organized the final acceptance ceremony for the 110kV T220 Van Ninh &#8211; Van Gia and T220 Van Ninh &#8211; Deo Ca transmission line projects. The ceremony took place at the 220kV Van Ninh Substation area, with the participation of representatives from Khanh Hoa Power Joint [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":2613,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[33,34,15],"tags":[68,69,70,71,67],"acf":[],"_links":{"self":[{"href":"https:\/\/vtechco.com\/en\/wp-json\/wp\/v2\/posts\/2816"}],"collection":[{"href":"https:\/\/vtechco.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/vtechco.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/vtechco.com\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/vtechco.com\/en\/wp-json\/wp\/v2\/comments?post=2816"}],"version-history":[{"count":3,"href":"https:\/\/vtechco.com\/en\/wp-json\/wp\/v2\/posts\/2816\/revisions"}],"predecessor-version":[{"id":2819,"href":"https:\/\/vtechco.com\/en\/wp-json\/wp\/v2\/posts\/2816\/revisions\/2819"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/vtechco.com\/en\/wp-json\/wp\/v2\/media\/2613"}],"wp:attachment":[{"href":"https:\/\/vtechco.com\/en\/wp-json\/wp\/v2\/media?parent=2816"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/vtechco.com\/en\/wp-json\/wp\/v2\/categories?post=2816"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/vtechco.com\/en\/wp-json\/wp\/v2\/tags?post=2816"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}