{"id":2194,"date":"2025-06-09T02:44:15","date_gmt":"2025-06-09T02:44:15","guid":{"rendered":"https:\/\/vtechco.com\/?p=2194"},"modified":"2025-06-09T04:47:41","modified_gmt":"2025-06-09T04:47:41","slug":"groundbreaking-ceremony-for-truong-son-2-wind-power-plant-project-in-laos","status":"publish","type":"post","link":"https:\/\/vtechco.com\/en\/groundbreaking-ceremony-for-truong-son-2-wind-power-plant-project-in-laos\/","title":{"rendered":"Groundbreaking Ceremony for Truong Son 2 Wind Power Plant Project in Laos"},"content":{"rendered":"<p><strong>June 8, 2025 &#8211; Bolikhamxay Province, Lao PDR <\/strong>\u2013 Viet Technology Company Limited (VTECH) held the groundbreaking ceremony for the construction of the Truong Son 2 Wind Power Plant Project in Xaychamphone and Khamkeuth districts, Bolikhamxay Province, Lao People&#8217;s Democratic Republic. The project is owned by Truong Son 2 Wind Power Investment Joint Stock Company, with VTECH serving as the EPC contractor.<\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"wp-image-2180 aligncenter\" src=\"https:\/\/vtechco.com\/wp-content\/uploads\/2025\/06\/Dua-an-truong-son-1-300x225.jpg\" alt=\"\" width=\"495\" height=\"371\" srcset=\"https:\/\/vtechco.com\/wp-content\/uploads\/2025\/06\/Dua-an-truong-son-1-300x225.jpg 300w, https:\/\/vtechco.com\/wp-content\/uploads\/2025\/06\/Dua-an-truong-son-1-1024x768.jpg 1024w, https:\/\/vtechco.com\/wp-content\/uploads\/2025\/06\/Dua-an-truong-son-1-768x576.jpg 768w, https:\/\/vtechco.com\/wp-content\/uploads\/2025\/06\/Dua-an-truong-son-1-1536x1152.jpg 1536w, https:\/\/vtechco.com\/wp-content\/uploads\/2025\/06\/Dua-an-truong-son-1-2048x1536.jpg 2048w\" sizes=\"(max-width: 495px) 100vw, 495px\" \/><\/p>\n<p data-sourcepos=\"6:1-6:207\">This event marks another significant milestone in VTECH&#8217;s ongoing development, underscoring its proven capability and capacity to execute energy infrastructure projects both domestically and internationally.<\/p>\n<p data-sourcepos=\"8:1-8:317\">As per the implementation plan, VTECH is responsible for the following key scopes of work: material procurement and construction for the <strong>220kV substation<\/strong>; and the supply and transportation of steel poles, foundation anchor bolts, and grounding systems for the <strong>220kV transmission line<\/strong> and <strong>220kV substation<\/strong>.<\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\" wp-image-2182 aligncenter\" src=\"https:\/\/vtechco.com\/wp-content\/uploads\/2025\/06\/Dua-an-truong-son-300x225.jpg\" alt=\"\" width=\"500\" height=\"375\" srcset=\"https:\/\/vtechco.com\/wp-content\/uploads\/2025\/06\/Dua-an-truong-son-300x225.jpg 300w, https:\/\/vtechco.com\/wp-content\/uploads\/2025\/06\/Dua-an-truong-son-1024x768.jpg 1024w, https:\/\/vtechco.com\/wp-content\/uploads\/2025\/06\/Dua-an-truong-son-768x576.jpg 768w, https:\/\/vtechco.com\/wp-content\/uploads\/2025\/06\/Dua-an-truong-son-1536x1152.jpg 1536w, https:\/\/vtechco.com\/wp-content\/uploads\/2025\/06\/Dua-an-truong-son-2048x1536.jpg 2048w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p>\n<p data-sourcepos=\"10:1-10:535\">Leveraging over 20 years of experience in the construction of power and renewable energy projects, VTECH is committed to allocating appropriate resources, ensuring safe and high-quality construction, and adhering to the project schedule to meet the owner&#8217;s objectives. The trust placed in VTECH by the project owner is not only evident in their selection as the primary partner but also signifies recognition of VTECH&#8217;s robust internal capabilities, professional management system, and highly skilled team of engineers and technicians.<\/p>\n<p data-sourcepos=\"12:1-12:311\">The Truong Son 2 Wind Power Plant Project is slated for commissioning in Q4 2025. It is anticipated to contribute significantly to the clean and sustainable energy development strategy in Southeast Asia, concurrently creating numerous opportunities for VTECH&#8217;s collaboration and growth in international markets.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>June 8, 2025 &#8211; Bolikhamxay Province, Lao PDR \u2013 Viet Technology Company Limited (VTECH) held the groundbreaking ceremony for the construction of the Truong Son 2 Wind Power Plant Project in Xaychamphone and Khamkeuth districts, Bolikhamxay Province, Lao People&#8217;s Democratic Republic. The project is owned by Truong Son 2 Wind Power Investment Joint Stock Company, [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":2181,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[33,15,34],"tags":[49],"acf":[],"_links":{"self":[{"href":"https:\/\/vtechco.com\/en\/wp-json\/wp\/v2\/posts\/2194"}],"collection":[{"href":"https:\/\/vtechco.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/vtechco.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/vtechco.com\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/vtechco.com\/en\/wp-json\/wp\/v2\/comments?post=2194"}],"version-history":[{"count":1,"href":"https:\/\/vtechco.com\/en\/wp-json\/wp\/v2\/posts\/2194\/revisions"}],"predecessor-version":[{"id":2195,"href":"https:\/\/vtechco.com\/en\/wp-json\/wp\/v2\/posts\/2194\/revisions\/2195"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/vtechco.com\/en\/wp-json\/wp\/v2\/media\/2181"}],"wp:attachment":[{"href":"https:\/\/vtechco.com\/en\/wp-json\/wp\/v2\/media?parent=2194"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/vtechco.com\/en\/wp-json\/wp\/v2\/categories?post=2194"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/vtechco.com\/en\/wp-json\/wp\/v2\/tags?post=2194"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}