- Investor: Phu My Thermal Power Company
- Implementation period: 3/2020 – 8/2020

- Scope of Supply:
- Routers, Switches…
- Firewall devices
- GPS
- RTU
- 220kV/33kV Primary Equipment
- Protection Control & Metering Panels
- Telecommunications Information and SCADA Systems
- Construction of Substation and 220kV Line
- Service:
- Construction, Installation and Welding of ODF, Pulling and Connecting Cables
- Installing SCADA system
- Gateway Configuration Setting
- Testing Commissioning and Acceptance of SCADA System