Sam Son 220kV transformer station project and Thanh Hoa – Sam Son 220kV connection line
Construction and installation of transmission line from ĐĐ to T.26 of 220kV Sam Son Substation Project and 220kV Thanh Hoa – Sam Son Connection Line
Investor:
Central Power Project Management Board
Contract performance time:
January 2025
Location:
Thanh Hoa Province
Status:
In progress
Project Detail
220kV Sam Son Substation Project and 220kV Thanh Hoa – Sam Son Connection Line