Sam Son 220kV transformer station project and Thanh Hoa – Sam Son 220kV connection line

Construction and installation of transmission line from ĐĐ to T.26 of 220kV Sam Son Substation Project and 220kV  Thanh Hoa – Sam Son Connection Line

Investor

Investor:

Central Power Project Management Board
Contract performance time

Contract performance time:

January 2025
Location

Location:

Thanh Hoa Province
Status

Status:

In progress

Project Detail

220kV Sam Son Substation Project and 220kV Thanh Hoa – Sam Son Connection Line