Setting up the centralized information point at EVN Building

  • Investor: Vietnam Electricity Group
  • Implementation period: 10/2014 – 01/2015
  • Scope of Supply:
  • SHD Optical transmission device
  • PCM-30 device
  • Monitoring software system
  • 48VDC power supply system, battery
  • IT system: Server, optical switch
  • Installation, configuration, testing and commissioning of all equipment and 48VDC power system, battery
  • Installing, configuring IT systems for monitoring systems