Construction of telecommunications system EVN HANOI

  • Investor: Hanoi Power Corporation
  • Implementation: 12/2016 – 04/2017

Scope of supply:

  • STM – 64/16/4/1 – Coriant HiT7065 optical transmission equipment
  • TNMS V15/Coriant software
  • 220VAC/48VDC power device
  • ADSS/M3 optical cable
  • Vision battery system
  • Sisco WS – 3750X – 125 – E Switch
  • Installation, testing and commissioning to put into operation of all transmission equipment, power device, battery, switch
  • Installation of SDH network monitoring and managerment software, optical switch
  • Training management and operation of SDH network, optical switch

Leave a Reply

Your email address will not be published.