- Investor: GA Power solar park Cam Xuyen Ltd
- Implementation period: 5/2020 – 12/2020

- Scope of Supply:
- 110kV transformer
- 110kV / 22kV primary equipment
- Measuring and protecting control cabinet
- Telecommunications & SCADA system
- Building substations and 110kV lines
- Service:
- Consulting design, installation, testing commissioning and energizing to put the project into commercial operation