- Investor: Power transmission Company No.2
- Implementation period: 8/2015 – 3/2016

Ngu Hanh Son Substation
Score of supply:
- STM1/4/16 – Coriant HiT 7080/7065, optical transmission equipment.
- Distant Protecting equipment – Siemens SWT3000.
- Router functioning with Switch – Cisco WS-C3650-24TS-S.
- Building databases to IEC 60870-5-101 at Gateway of Ngu Hanh Son TBA 220kV.
- Experimentation of adjusting to SCADA with Central Region Load Dispatch Centre A3 (IEC 60870-5-101).
- Experimentation of adjusting to SCADA with NPT (IEC 60870-5-104).