Thanh Cong – Thuong Dinh 100kV Underground Cable

  • Investor: Hanoi Power Corporation – Subcontractor for the general Chongquing Taishan Cable
  • Implementation period: 7/2017 – 12/2019
  • Scope of supply:
  • Installation and testing of two 11okV GIS bays
  • Installation and testing of 110kV underground cable
  • Installation and testing of DTS Equipment
  • Installation and testing of 110kV connector box
  • Construction, road reimbursement
  • Building, Configuaration of Telecommunication, SCADA system
  • Provide materials and equipment